Dedicated to providing customers with solutions for drying equipment
We have continuously innovated and transformed a series of process optimized and energy-saving products in product development and research according to market needs.
Location: Home > Quality Assurance

Quality Assurance

Quality policy.

Scientific management, careful production, sincere service, customer satisfaction


Quality Targets.

(1)Qualified rate of products>98.5%.

(2)Delivery according to the contract, on-schedule delivery rate>99%.

(3)Customer quality complaint handling completion rate 100%.

(4) Customer satisfaction >90%; (5) New products (including new products) >10%; (6) New products (including new products) >10%.

(5) Development and design of new products (including improved varieties, new structures, etc.) completed 2.


Quality control.

1、Design control

Before the design, as far as possible sampling test, technical personnel according to the user's specific requirements combined with the actual situation of the test for scientific and rational design, and the preparation of equipment manufacturing process technology card.

2、Procurement control

Establish the sub-supplier list, and the sub-supplier to carry out strict investigation and comparison, follow the principle of high quality and good price, establish the sub-supplier file, the same species of outsourcing outsourcing parts, can be normally supplied by the sub-supplier shall not be less than one.

3、Cattle production control

Production must be based on technical documents, the processed qualified products for each process must be labeled. Key parts marking should be clear to ensure product traceability.

4、Inspection control

(1) by full-time inspectors of raw materials and outsourcing, outsourcing parts inspection, batch size, can be sampling, but the sampling rate shall not be less than 30%, the key, precision outsourcing parts, outsourcing parts must be inspected.

(2) The processing of self-made parts must be self-inspection, mutual inspection, re-inspection, all qualified to be qualified products.

(3) Finished products can be installed in the plant and start the machine, start in the plant to test the machine inspection, inspection of qualified before leaving the factory, can not be installed in the plant within the machine must be phased rigorous inspection, in the demand side of the plant installation is completed and the success of the test machine, the issuance of inspection certificate.

Products
Message
Contact

Tel

Phone: +0086-13915898166
Tel: +0086-0519-88908166

E-mail

jwdry8166@163.com

Address

Zhenglu Industrial Park, Tianning
Economic Development Zone,
Changzhou City, Jiangsu Province,
China

Changzhou GIN WANT Drying Equipment Co., Ltd.
Copyright 2024 Changzhou GIN WANT Drying Equipment Co., Ltd. Copyright Notice Support: Eastnet
Copyright © 2024 GIN WANT
XChangzhou GIN WANT Drying Equipment Co., Ltd.

Long press the QR code to open

GIN WANT

This WeChat has been recognized, please add this friend!
+0086-13915898166

Open QR code